{"id":75784,"date":"2026-10-02T16:31:43","date_gmt":"2026-10-02T19:31:43","guid":{"rendered":"https:\/\/actiosoftware.com\/?p=75784"},"modified":"2026-10-02T16:31:45","modified_gmt":"2026-10-02T19:31:45","slug":"notacao-bpmn","status":"publish","type":"post","link":"https:\/\/actiosoftware.com\/en\/blog\/notacao-bpmn\/","title":{"rendered":"BPMN Notation: Learn how to model business processes\u00a0"},"content":{"rendered":"<p>Para gestores de m\u00e9dias e grandes empresas, dominar a nota\u00e7\u00e3o BPMN significa enxergar, com precis\u00e3o, como decis\u00f5es, \u00e1reas e sistemas se conectam para entregar resultado.&nbsp;<\/p>\n\n\n\n<p>Neste guia, voc\u00ea entende o que \u00e9 a nota\u00e7\u00e3o BPMN, seus elementos centrais, a diferen\u00e7a para o fluxograma tradicional e o papel dela na execu\u00e7\u00e3o da estrat\u00e9gia. Tamb\u00e9m mostramos como a governan\u00e7a documental sustenta a nota\u00e7\u00e3o BPMN ao longo do tempo.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-o-que-e-notacao-bpmn-e-por-que-ela-importa-para-gestores-nbsp\"><strong>O que \u00e9 nota\u00e7\u00e3o BPMN e por que ela importa para gestores?<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN (Business Process Model and Notation) \u00e9 um padr\u00e3o gr\u00e1fico internacional para representar processos de neg\u00f3cio. Ela usa s\u00edmbolos \u00fanicos para atividades, eventos, decis\u00f5es e respons\u00e1veis, permitindo que neg\u00f3cio e tecnologia interpretem o mesmo desenho sem ambiguidade e conectem a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.&nbsp;<\/p>\n\n\n\n<p>Em termos executivos, a nota\u00e7\u00e3o BPMN funciona como a planta de uma organiza\u00e7\u00e3o em movimento, mostrando como o trabalho realmente flui, e n\u00e3o apenas como o organograma sugere que deveria fluir.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-origem-e-padronizacao-da-notacao-bpmn-nbsp\"><strong>Origem e padroniza\u00e7\u00e3o da nota\u00e7\u00e3o BPMN<\/strong>&nbsp;<\/h3>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN nasceu na Business Process Management Initiative e, desde a fus\u00e3o de 2005, \u00e9 mantida pelo <a href=\"https:\/\/www.omg.org\/spec\/BPMN\/\" target=\"_blank\" rel=\"noreferrer noopener\">Object Management Group (OMG)<\/a>. A vers\u00e3o 2.0.2 foi publicada pela ISO como ISO\/IEC 19510:2013.&nbsp;<\/p>\n\n\n\n<p>Segundo o OMG, a nota\u00e7\u00e3o BPMN foi concebida para ser usada por quem desenha, gerencia e executa processos, com precis\u00e3o suficiente para ser traduzida em componentes de software. Essa dupla voca\u00e7\u00e3o explica a longevidade da nota\u00e7\u00e3o BPMN.&nbsp;<\/p>\n\n\n\n<p>Actio\u2019s <a href=\"https:\/\/www.gartner.com\/en\/information-technology\/glossary?glossarykeyword=Business+analytics\" target=\"_blank\" rel=\"noreferrer noopener\">gloss\u00e1rio do Gartner<\/a> classifica esse tipo de especifica\u00e7\u00e3o como padr\u00e3o de BPM, isto \u00e9, um conjunto de normas abertas usado para modelar e executar processos de neg\u00f3cio.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-como-a-notacao-bpmn-estrutura-a-linguagem-bpmn-dos-processos-nbsp\"><strong>Como a nota\u00e7\u00e3o BPMN estrutura a linguagem BPMN dos processos<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN organiza o desenho em cinco fam\u00edlias de elementos: objetos de fluxo, dados, objetos de conex\u00e3o, raias e artefatos. Combinados, esses s\u00edmbolos descrevem quem executa, o que acontece, em que ordem e sob quais condi\u00e7\u00f5es, formando uma linguagem consistente e leg\u00edvel por todas as \u00e1reas.&nbsp;<\/p>\n\n\n\n<p>A for\u00e7a da linguagem BPMN est\u00e1 na sem\u00e2ntica. Cada s\u00edmbolo da nota\u00e7\u00e3o BPMN carrega uma regra de leitura, o que elimina a interpreta\u00e7\u00e3o subjetiva comum em desenhos livres.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-eventos-atividades-e-gateways-nbsp\"><strong>Eventos, atividades e gateways<\/strong>&nbsp;<\/h3>\n\n\n\n<p>Tr\u00eas grupos concentram a maior parte da informa\u00e7\u00e3o de um modelo. A tabela abaixo resume cada elemento e a pergunta de gest\u00e3o que ele responde.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Element<\/strong>&nbsp;<\/td><td><strong>Fun\u00e7\u00e3o na nota\u00e7\u00e3o BPMN<\/strong>&nbsp;<\/td><td><strong>Pergunta de gest\u00e3o<\/strong>&nbsp;<\/td><\/tr><tr><td>Evento (in\u00edcio, intermedi\u00e1rio, fim)&nbsp;<\/td><td>Dispara, interrompe ou encerra o processo&nbsp;<\/td><td>O que inicia e o que conclui o processo?&nbsp;<\/td><\/tr><tr><td>Atividade (tarefa, subprocesso)&nbsp;<\/td><td>Representa o trabalho executado&nbsp;<\/td><td>Quem faz o qu\u00ea?&nbsp;<\/td><\/tr><tr><td>Gateway&nbsp;<\/td><td>Define decis\u00f5es e execu\u00e7\u00f5es paralelas&nbsp;<\/td><td>Onde o processo se bifurca e com qual crit\u00e9rio?&nbsp;<\/td><\/tr><tr><td>Pool e raia&nbsp;<\/td><td>Identificam participantes e respons\u00e1veis&nbsp;<\/td><td>Quem responde por cada etapa?&nbsp;<\/td><\/tr><tr><td>Artefato e dados&nbsp;<\/td><td>Registram documentos e anota\u00e7\u00f5es&nbsp;<\/td><td>Que informa\u00e7\u00e3o sustenta a execu\u00e7\u00e3o?&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-pools-raias-e-fluxos-bpmn-nbsp\"><strong>Pools, raias e fluxos BPMN<\/strong>&nbsp;<\/h3>\n\n\n\n<p>Na nota\u00e7\u00e3o, os fluxos BPMN distinguem dois tipos de liga\u00e7\u00e3o. O fluxo de sequ\u00eancia define a ordem das atividades dentro de um participante, enquanto o fluxo de mensagem representa a comunica\u00e7\u00e3o entre participantes distintos.&nbsp;<\/p>\n\n\n\n<p>Essa separa\u00e7\u00e3o torna expl\u00edcitos os hand-offs entre \u00e1reas. \u00c9 nesse ponto que a nota\u00e7\u00e3o BPMN revela depend\u00eancias que o organograma esconde, e \u00e9 a\u00ed que a nota\u00e7\u00e3o BPMN mais ajuda a diagnosticar atrasos.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-bpmn-versus-fluxograma-tradicional-o-que-muda-para-a-gestao-nbsp\"><strong>BPMN versus fluxograma tradicional: o que muda para a gest\u00e3o<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A diferen\u00e7a central \u00e9 a sem\u00e2ntica. O fluxograma tradicional aceita s\u00edmbolos livres e depende de interpreta\u00e7\u00e3o individual, enquanto o BPMN define regras formais para eventos, gateways e participantes.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Por isso o desenho vira especifica\u00e7\u00e3o audit\u00e1vel, compar\u00e1vel entre \u00e1reas e pass\u00edvel de automa\u00e7\u00e3o em escala corporativa.&nbsp;<\/p>\n\n\n\n<p>Isso n\u00e3o invalida o uso de <a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-flowchart-how-to-use-to-strengthen-governance\/\" target=\"_blank\" rel=\"noreferrer noopener\">fluxogramas de processos<\/a> como instrumento de governan\u00e7a. Significa que a nota\u00e7\u00e3o BPMN eleva o rigor quando a empresa precisa de comparabilidade e escala.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Criterion<\/strong>&nbsp;<\/td><td><strong>Fluxograma tradicional<\/strong>&nbsp;<\/td><td><strong>Nota\u00e7\u00e3o BPMN<\/strong>&nbsp;<\/td><\/tr><tr><td>Standardization&nbsp;<\/td><td>S\u00edmbolos variam por autor&nbsp;<\/td><td>Padr\u00e3o ISO\/IEC 19510&nbsp;<\/td><\/tr><tr><td>Decis\u00f5es&nbsp;<\/td><td>Losango gen\u00e9rico&nbsp;<\/td><td>Gateways com tipos definidos&nbsp;<\/td><\/tr><tr><td>Responsabilidades&nbsp;<\/td><td>Opcionais&nbsp;<\/td><td>Pools e raias expl\u00edcitos&nbsp;<\/td><\/tr><tr><td>Automation&nbsp;<\/td><td>Pouco aproveit\u00e1vel&nbsp;<\/td><td>Base para execu\u00e7\u00e3o em sistemas&nbsp;<\/td><\/tr><tr><td>Auditing&nbsp;<\/td><td>Depende de quem desenhou&nbsp;<\/td><td>Leitura uniforme entre \u00e1reas&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-quando-a-notacao-bpmn-gera-valor-estrategico-nbsp\"><strong>Quando a nota\u00e7\u00e3o BPMN gera valor estrat\u00e9gico<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN gera valor quando torna vis\u00edveis os pontos de decis\u00e3o, os hand-offs e os gargalos ao longo do processo ponta a ponta.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Com essa visibilidade, a lideran\u00e7a prioriza melhorias, define indicadores por etapa e conecta a execu\u00e7\u00e3o operacional aos objetivos estrat\u00e9gicos com base em dados.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-visibilidade-de-hand-offs-e-gargalos-nbsp\"><strong>Visibilidade de hand-offs e gargalos<\/strong>&nbsp;<\/h3>\n\n\n\n<p>Em an\u00e1lise de 2024, a <a href=\"https:\/\/www.mckinsey.com\/industries\/retail\/our-insights\/deconstructing-silos-to-discover-savings-the-end-to-end-excellence-playbook-for-retailers\" target=\"_blank\" rel=\"noreferrer noopener\">McKinsey descreve<\/a> que valor se perde nas transi\u00e7\u00f5es ineficientes entre equipes e em processos opacos. Em um varejista, a abordagem ponta a ponta reduziu em 10% o custo operacional da cadeia.&nbsp;<\/p>\n\n\n\n<p>Modelar com a nota\u00e7\u00e3o BPMN exp\u00f5e esses pontos de perda, e a nota\u00e7\u00e3o BPMN oferece a precis\u00e3o necess\u00e1ria para prioriz\u00e1-los. A partir da\u00ed, a <a href=\"https:\/\/actiosoftware.com\/en\/blog\/production-bottlenecks\/\" target=\"_blank\" rel=\"noreferrer noopener\">an\u00e1lise de gargalos<\/a> deixa de ser intuitiva e passa a ter m\u00e9todo.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-processos-como-elo-entre-estrategia-e-indicadores-nbsp\"><strong>Processos como elo entre estrat\u00e9gia e indicadores<\/strong>&nbsp;<\/h3>\n\n\n\n<p>Kaplan e Norton inclu\u00edram a perspectiva de processos internos no <a href=\"https:\/\/hbr.org\/2007\/07\/using-the-balanced-scorecard-as-a-strategic-management-system\" target=\"_blank\" rel=\"noreferrer noopener\">Balanced Scorecard<\/a> justamente para ligar a estrat\u00e9gia \u00e0 opera\u00e7\u00e3o. Um modelo bem desenhado indica onde medir.&nbsp;<\/p>\n\n\n\n<p>Com a nota\u00e7\u00e3o BPMN, o desenho indica onde medir: tempo por etapa, taxa de retrabalho e SLA de decis\u00e3o ganham ponto de coleta definido. Isso alimenta os <a href=\"https:\/\/actiosoftware.com\/en\/blog\/practical-guide-to-kpi-implementation\/\" target=\"_blank\" rel=\"noreferrer noopener\">KPIs<\/a> e fortalece o planejamento estrat\u00e9gico e sua execu\u00e7\u00e3o.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-niveis-de-uso-da-notacao-bpmn-descritivo-analitico-e-executavel-nbsp\"><strong>N\u00edveis de uso da nota\u00e7\u00e3o BPMN: descritivo, anal\u00edtico e execut\u00e1vel<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN pode ser usada em tr\u00eas n\u00edveis de profundidade, e cada n\u00edvel atende a um p\u00fablico diferente. O descritivo documenta o fluxo para comunica\u00e7\u00e3o, o anal\u00edtico adiciona regras e dados para diagn\u00f3stico, e o execut\u00e1vel detalha o suficiente para que um sistema rode o processo automaticamente.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Level<\/strong>&nbsp;<\/td><td><strong>Objective<\/strong>&nbsp;<\/td><td><strong>Target audience<\/strong>&nbsp;<\/td><\/tr><tr><td>Descritivo&nbsp;<\/td><td>Comunicar e alinhar&nbsp;<\/td><td>Gestores e donos de processo&nbsp;<\/td><\/tr><tr><td>Anal\u00edtico&nbsp;<\/td><td>Diagnosticar e simular&nbsp;<\/td><td>Analistas e \u00e1reas de excel\u00eancia&nbsp;<\/td><\/tr><tr><td>Execut\u00e1vel&nbsp;<\/td><td>Automatizar a execu\u00e7\u00e3o&nbsp;<\/td><td>Tecnologia e opera\u00e7\u00f5es&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Os processos BPMN execut\u00e1veis exigem maturidade em dados e integra\u00e7\u00e3o. Antes de chegar a esse n\u00edvel, vale avaliar o <a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-automation-software\/\" target=\"_blank\" rel=\"noreferrer noopener\">software de automa\u00e7\u00e3o de processos<\/a> mais adequado ao seu contexto.&nbsp;<\/p>\n\n\n\n<p>Felizmente, a nota\u00e7\u00e3o BPMN suporta uma evolu\u00e7\u00e3o gradual, servindo tanto a \u00e1reas iniciantes quanto \u00e0s mais maduras, sem exigir que a empresa comece pelo n\u00edvel mais complexo.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-como-implementar-a-notacao-bpmn-nbsp\"><strong>Como implementar a nota\u00e7\u00e3o BPMN<\/strong>&nbsp;<\/h2>\n\n\n\n<p>Para implementar a nota\u00e7\u00e3o BPMN com governan\u00e7a, defina o escopo de processos cr\u00edticos, padronize conven\u00e7\u00f5es de modelagem, valide os desenhos com quem executa, nomeie donos e controle vers\u00f5es e aprova\u00e7\u00f5es.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Sem isso, os modelos envelhecem e perdem valor como refer\u00eancia de gest\u00e3o para toda a empresa.&nbsp;<\/p>\n\n\n\n<p>A ado\u00e7\u00e3o da nota\u00e7\u00e3o BPMN falha quando \u00e9 tratada como exerc\u00edcio de desenho. Ela prospera com dono, conven\u00e7\u00f5es e rotina de revis\u00e3o. Cinco pr\u00e1ticas sustentam essa disciplina:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Defina o escopo:<\/strong> priorize processos cr\u00edticos, conforme a cadeia de valor;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Padronize conven\u00e7\u00f5es:<\/strong> nomenclatura, n\u00edvel de detalhe e s\u00edmbolos permitidos;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Validate with the executor:<\/strong> o desenho em nota\u00e7\u00e3o BPMN deve refletir o trabalho real;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Nomeie donos de processo:<\/strong> cada modelo precisa de respons\u00e1vel e periodicidade de revis\u00e3o;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Me\u00e7a continuamente:<\/strong> acompanhe desvios por meio de um <a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-control-system\/\" target=\"_blank\" rel=\"noreferrer noopener\">process control system<\/a>.\u00a0<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-gestao-documental-como-sustentacao-dos-modelos-nbsp\"><strong>Gest\u00e3o documental como sustenta\u00e7\u00e3o dos modelos<\/strong>&nbsp;<\/h3>\n\n\n\n<p>Todo modelo em nota\u00e7\u00e3o BPMN \u00e9 informa\u00e7\u00e3o documentada: tem vers\u00e3o, aprovador, vig\u00eancia e p\u00fablico autorizado. Sem controle, equipes executam desenhos obsoletos e a auditoria perde rastreabilidade.&nbsp;<\/p>\n\n\n\n<p>Nesse ponto, o Gest\u00e3o de Documentos da Actio centraliza modelos, pol\u00edticas e <a href=\"https:\/\/actiosoftware.com\/en\/blog\/standard-operating-procedure\/\" target=\"_blank\" rel=\"noreferrer noopener\">procedimentos operacionais padr\u00e3o<\/a>, com fluxo de aprova\u00e7\u00e3o e hist\u00f3rico de revis\u00f5es.&nbsp;<\/p>\n\n\n\n<p>Essa rastreabilidade fortalece o compliance como pilar de governan\u00e7a e garante que fluxos BPMN aprovados sejam, de fato, os que a opera\u00e7\u00e3o consulta.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-erros-comuns-ao-adotar-a-notacao-bpmn-nbsp\"><strong>Erros comuns ao adotar a nota\u00e7\u00e3o BPMN<\/strong>&nbsp;<\/h2>\n\n\n\n<p>Os erros mais comuns ao adotar a nota\u00e7\u00e3o BPMN s\u00e3o o excesso de detalhe, o uso incorreto de gateways, modelos sem dono e a aus\u00eancia de um reposit\u00f3rio oficial. Todos nascem de falhas de gest\u00e3o, n\u00e3o de limita\u00e7\u00f5es da t\u00e9cnica, e podem ser evitados com governan\u00e7a desde o in\u00edcio.&nbsp;<\/p>\n\n\n\n<p>Reconhec\u00ea-los cedo evita retrabalho e descr\u00e9dito do programa:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Excesso de detalhe:<\/strong> modelos extensos que ningu\u00e9m consulta;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Uso incorreto de gateways:<\/strong> decis\u00f5es amb\u00edguas que comprometem a leitura;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Modelos sem dono:<\/strong> desenhos que envelhecem sem revis\u00e3o;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Foco apenas em TI:<\/strong> a nota\u00e7\u00e3o BPMN perde valor quando o neg\u00f3cio n\u00e3o participa;\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Aus\u00eancia de arquivo oficial:<\/strong> vers\u00f5es paralelas da nota\u00e7\u00e3o BPMN circulando entre \u00e1reas.\u00a0<\/li>\n<\/ul>\n\n\n\n<p>Se o seu desafio \u00e9 levantar o processo atual, comece pelas <a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-mapping-tools\/\" target=\"_blank\" rel=\"noreferrer noopener\">process mapping tools<\/a>.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-o-proximo-passo-para-a-sua-operacao-nbsp\"><strong>O pr\u00f3ximo passo para a sua opera\u00e7\u00e3o<\/strong>&nbsp;<\/h2>\n\n\n\n<p>A nota\u00e7\u00e3o BPMN responde a uma necessidade clara da lideran\u00e7a: transformar processos em ativos leg\u00edveis, compar\u00e1veis e govern\u00e1veis. Como padr\u00e3o internacional, a nota\u00e7\u00e3o BPMN cria uma base \u00fanica para an\u00e1lise, automa\u00e7\u00e3o e execu\u00e7\u00e3o da estrat\u00e9gia.&nbsp;<\/p>\n\n\n\n<p>O ganho real da nota\u00e7\u00e3o BPMN aparece quando o modelo deixa de ser desenho e passa a ser documento vivo, com dono, vers\u00e3o e revis\u00e3o. Com a <a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-digitization\/\" target=\"_blank\" rel=\"noreferrer noopener\">digitaliza\u00e7\u00e3o de processos<\/a>, essa disciplina da nota\u00e7\u00e3o BPMN escala.&nbsp;<\/p>\n\n\n\n<p><strong>Pronto para dar governan\u00e7a aos seus modelos?<\/strong> Meet the <a href=\"https:\/\/actiosoftware.com\/en\/document-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gest\u00e3o de Documentos da Actio<\/a> e centralize vers\u00f5es, aprova\u00e7\u00f5es e acessos em um s\u00f3 lugar.&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>The BPMN notation is the international standard for modeling business processes with precision, aligning areas, decisions, and flows with the execution of the strategy.<\/p>","protected":false},"author":10,"featured_media":75785,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1257],"tags":[],"Idioma-posts":[1169,1168,1167],"class_list":["post-75784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-processos-e-operacoes","idioma-posts-espanhol","idioma-posts-ingles","idioma-posts-portugues"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nota\u00e7\u00e3o BPMN: guia completo para modelagem de processos<\/title>\n<meta name=\"description\" content=\"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/actiosoftware.com\/en\/blog\/notacao-bpmn\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0\" \/>\n<meta property=\"og:description\" content=\"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/actiosoftware.com\/en\/blog\/notacao-bpmn\/\" \/>\n<meta property=\"og:site_name\" content=\"Actio\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/actiobrasil\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-02T19:31:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-02T19:31:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1709\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guilherme Barbassa\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guilherme Barbassa\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/\"},\"author\":{\"name\":\"Guilherme Barbassa\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/cf23461d8ee5c5a8df7a56866d4ecf65\"},\"headline\":\"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0\",\"datePublished\":\"2026-10-02T19:31:43+00:00\",\"dateModified\":\"2026-10-02T19:31:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/\"},\"wordCount\":1771,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/doctor-writing-medical-notes-1-scaled.jpg\",\"articleSection\":[\"Processos e Opera\u00e7\u00f5es\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/\",\"name\":\"Nota\u00e7\u00e3o BPMN: guia completo para modelagem de processos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/doctor-writing-medical-notes-1-scaled.jpg\",\"datePublished\":\"2026-10-02T19:31:43+00:00\",\"dateModified\":\"2026-10-02T19:31:45+00:00\",\"description\":\"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#primaryimage\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/doctor-writing-medical-notes-1-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/doctor-writing-medical-notes-1-scaled.jpg\",\"width\":2560,\"height\":1709},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/notacao-bpmn\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/actiosoftware.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"name\":\"Actio\",\"description\":\"Softwares para gest\u00e3o estrat\u00e9gica\",\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/actiosoftware.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\",\"name\":\"Actio\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"width\":150,\"height\":37,\"caption\":\"Actio\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/actiobrasil\",\"https:\\\/\\\/www.instagram.com\\\/actiobrasil\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/actiosoftware\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/cf23461d8ee5c5a8df7a56866d4ecf65\",\"name\":\"Guilherme Barbassa\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"caption\":\"Guilherme Barbassa\"},\"description\":\"Guilherme Barbassa \u00e9 CEO da Actio Software, com mais de 20 anos de experi\u00eancia em gest\u00e3o estrat\u00e9gica e transforma\u00e7\u00e3o empresarial. Atua na integra\u00e7\u00e3o entre estrat\u00e9gia, governan\u00e7a e tecnologia, apoiando a alta lideran\u00e7a na constru\u00e7\u00e3o de sistemas de gest\u00e3o orientados a resultados.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/guilherme-barbassa-247b8932\\\/\"],\"url\":\"https:\\\/\\\/actiosoftware.com\\\/en\\\/blog\\\/author\\\/guiceo\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nota\u00e7\u00e3o BPMN: guia completo para modelagem de processos","description":"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/actiosoftware.com\/en\/blog\/notacao-bpmn\/","og_locale":"en_US","og_type":"article","og_title":"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0","og_description":"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.","og_url":"https:\/\/actiosoftware.com\/en\/blog\/notacao-bpmn\/","og_site_name":"Actio","article_publisher":"https:\/\/www.facebook.com\/actiobrasil","article_published_time":"2026-10-02T19:31:43+00:00","article_modified_time":"2026-10-02T19:31:45+00:00","og_image":[{"width":2560,"height":1709,"url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg","type":"image\/jpeg"}],"author":"Guilherme Barbassa","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guilherme Barbassa","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#article","isPartOf":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/"},"author":{"name":"Guilherme Barbassa","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/cf23461d8ee5c5a8df7a56866d4ecf65"},"headline":"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0","datePublished":"2026-10-02T19:31:43+00:00","dateModified":"2026-10-02T19:31:45+00:00","mainEntityOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/"},"wordCount":1771,"commentCount":0,"publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg","articleSection":["Processos e Opera\u00e7\u00f5es"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/","url":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/","name":"Nota\u00e7\u00e3o BPMN: guia completo para modelagem de processos","isPartOf":{"@id":"https:\/\/actiosoftware.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#primaryimage"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg","datePublished":"2026-10-02T19:31:43+00:00","dateModified":"2026-10-02T19:31:45+00:00","description":"Entenda a nota\u00e7\u00e3o BPMN, seus elementos e como gestores a usam para modelar processos, reduzir retrabalho e conectar a opera\u00e7\u00e3o \u00e0 estrat\u00e9gia.","breadcrumb":{"@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#primaryimage","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2026\/10\/doctor-writing-medical-notes-1-scaled.jpg","width":2560,"height":1709},{"@type":"BreadcrumbList","@id":"https:\/\/actiosoftware.com\/blog\/notacao-bpmn\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/actiosoftware.com\/"},{"@type":"ListItem","position":2,"name":"Nota\u00e7\u00e3o BPMN: Saiba como modelar processos de neg\u00f3cio\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/actiosoftware.com\/#website","url":"https:\/\/actiosoftware.com\/","name":"Actio","description":"Software for strategic management","publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/actiosoftware.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/actiosoftware.com\/#organization","name":"Actio","url":"https:\/\/actiosoftware.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","width":150,"height":37,"caption":"Actio"},"image":{"@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/actiobrasil","https:\/\/www.instagram.com\/actiobrasil\/","https:\/\/www.linkedin.com\/company\/actiosoftware\/"]},{"@type":"Person","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/cf23461d8ee5c5a8df7a56866d4ecf65","name":"Guilherme Barbassa","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","caption":"Guilherme Barbassa"},"description":"Guilherme Barbassa is the CEO of Actio Software, with over 20 years of experience in strategic management and business transformation. He works on the integration of strategy, governance, and technology, supporting senior leadership in building results-oriented management systems.","sameAs":["https:\/\/www.linkedin.com\/in\/guilherme-barbassa-247b8932\/"],"url":"https:\/\/actiosoftware.com\/en\/blog\/author\/guiceo\/"}]}},"_links":{"self":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/75784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/comments?post=75784"}],"version-history":[{"count":1,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/75784\/revisions"}],"predecessor-version":[{"id":75786,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/75784\/revisions\/75786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media\/75785"}],"wp:attachment":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media?parent=75784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/categories?post=75784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/tags?post=75784"},{"taxonomy":"idioma-posts","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/Idioma-posts?post=75784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}