{"id":38181,"date":"2025-10-27T10:30:00","date_gmt":"2025-10-27T13:30:00","guid":{"rendered":"https:\/\/actiosoftware.com?p=38181"},"modified":"2026-06-02T20:48:05","modified_gmt":"2026-06-02T23:48:05","slug":"everything-about-risk-management-in-projects","status":"publish","type":"post","link":"https:\/\/actiosoftware.com\/en\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/","title":{"rendered":"Project Risk Management: A Complete Guide Actio"},"content":{"rendered":"<\/p>\n\n\n\n<figure class=\"wp-block-audio\"><audio controls src=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/11\/Kayla-2408103.mp3\"><\/audio><\/figure>\n\n\n<p>\n\n\n\n\n\n\n<p>On paper, every project is born perfect. The schedule makes sense, the budget adds up, and the team seems aligned. The problem is that as soon as operations begin, the real world steps in: deadlines are blown, costs rise, and unforeseen events stall deliveries.&nbsp;<\/p>\n\n\n\n<p>In this case, trying to take the initiative relying on luck is not a strategy. And to ensure the profitability and efficiency of the business, the <strong>Risk management in projects<\/strong> It should be the engine of your decision-making. After all, this practice is the determining factor in predicting crises, protecting cash, and ensuring a real competitive advantage in the market.&nbsp;<\/p>\n\n\n\n<p>Continue reading with Actio and discover how to structure a foolproof risk plan to safeguard your results!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-o-que-e-o-gerenciamento-de-riscos-em-projetos\">What is Project Risk Management?<\/h2>\n\n\n\n<p>Actio\u2019s <a href=\"https:\/\/actiosoftware.com\/en\/blog\/understand-the-risk-management-cycle\/\" target=\"_blank\" rel=\"noreferrer noopener\">risk management<\/a> in projects, it is a systematic process. After all, it involves identifying, evaluating, and responding to events that can affect an initiative's progress and outcomes.<\/p>\n\n\n\n<p>And these threats take various forms in the corporate day-to-day. This is because they range from schedule delays and budget overruns to quality issues and operational failures.<\/p>\n\n\n\n<p>The main goal of risk management, therefore, is not just to avoid problems. The focus is on minimizing negative impacts while simultaneously identifying and leveraging opportunities that arise along the way.<\/p>\n\n\n\n<p><strong>Also read: <\/strong><a href=\"https:\/\/actiosoftware.com\/en\/blog\/process-mapping-how-to-structure\/\" target=\"_blank\" rel=\"noreferrer noopener\">Process mapping<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-a-importancia-do-gerenciamento-de-riscos-em-projetos\">The Importance of Project Risk Management<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/homens-de-negocios-recortados-fazendo-estrategias-com-um-grafico-de-negocios.jpg\" alt=\"importance of risk management in projects\" class=\"wp-image-38193\" srcset=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/homens-de-negocios-recortados-fazendo-estrategias-com-um-grafico-de-negocios.jpg 1000w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/homens-de-negocios-recortados-fazendo-estrategias-com-um-grafico-de-negocios-300x200.jpg 300w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/homens-de-negocios-recortados-fazendo-estrategias-com-um-grafico-de-negocios-768x512.jpg 768w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/homens-de-negocios-recortados-fazendo-estrategias-com-um-grafico-de-negocios-600x400.jpg 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p>Working proactively protects the company's cash flow and reputation. And when the team prepares for unforeseen events, the business gains efficiency.&nbsp;<\/p>\n\n\n\n<p>See the main practical benefits of this approach:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Reduction of Uncertainties:<\/strong> Mapping makes projects more predictable and easier to control.;<\/li>\n\n\n\n<li><strong>Improvement in Decision-Making:<\/strong> Data analysis provides valuable insights for leaders to make decisions with confidence.;<\/li>\n\n\n\n<li><strong>Real resource economy:<\/strong> Identifying risks early avoids financial waste and team rework.;<\/li>\n\n\n\n<li><strong>Opportunity Utilization:<\/strong> allows you to see innovation and market gaps before the competition.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-as-5-etapas-do-gerenciamento-de-riscos-em-projetos\">The 5 stages of project risk management<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/empresario-asiatico-interagindo-com-grafico-tridimensional-de-realidade-aumentada-analisando-informacoes-de-negocios.jpg\" alt=\"stages of risk management in projects\" class=\"wp-image-38195\" srcset=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/empresario-asiatico-interagindo-com-grafico-tridimensional-de-realidade-aumentada-analisando-informacoes-de-negocios.jpg 1000w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/empresario-asiatico-interagindo-com-grafico-tridimensional-de-realidade-aumentada-analisando-informacoes-de-negocios-300x200.jpg 300w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/empresario-asiatico-interagindo-com-grafico-tridimensional-de-realidade-aumentada-analisando-informacoes-de-negocios-768x512.jpg 768w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/empresario-asiatico-interagindo-com-grafico-tridimensional-de-realidade-aumentada-analisando-informacoes-de-negocios-600x400.jpg 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p>Risk management doesn't happen by chance, nor can it be treated as a one-time event. This is because it functions as a cyclical process composed of interconnected stages. In this way, each phase is fundamental to ensuring that leadership has full control over the variables that could derail operations.<\/p>\n\n\n\n<p>Here's how to structure each of these steps deeply and professionally in your project:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Detailed identification of risks<\/h3>\n\n\n\n<p>The starting point is to discover and document all threats that orbit the initiative. And this phase should not be limited to an obvious list made in five minutes: the project team needs to dive into the business's backstory.<\/p>\n\n\n\n<p>In addition, for it to be efficient, this step requires reviewing technical documentation, the history of failures from previous projects, and conducting <em>workshops<\/em> and sessions of <em>brainstorming<\/em> with the main <em>stakeholders<\/em>. The objective here is to compile a comprehensive inventory.&nbsp;<\/p>\n\n\n\n<p>It should include everything from technical risks (such as server instability) to macroeconomic, labor, and supply risks.<\/p>\n\n\n\n<p><strong>Related:<\/strong> <a href=\"https:\/\/actiosoftware.com\/en\/blog\/risk-audit-concept-steps-types\/\" target=\"_blank\" rel=\"noreferrer noopener\">Risk audit<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-2-analise-de-riscos\">2. Risk analysis\u00a0<\/h3>\n\n\n\n<p>With the inventory in hand, the next step is to qualify and quantify the size of the problem. After all, not every risk deserves the same level of energy or budget.&nbsp;<\/p>\n\n\n\n<p>Therefore, the team uses tools like <strong>risk management<\/strong> to cross two variables. What is the real chance of this event happening? If it happens, what will be the financial, operational, or reputational damage to the company?<\/p>\n\n\n\n<p>At this stage, risks are given a score or rating (such as High, Medium, and Low). This allows management to establish a clear cutoff line. Thus, the business focuses its resources on threats that truly have the power to paralyze operations or blow the budget.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Strategic response planning<\/h3>\n\n\n\n<p>This is where risk management turns into action. This is because, knowing the priority threats, the team meets to design contingency plans.&nbsp;<\/p>\n\n\n\n<p>But that's not all: no threat can go without a definitive response. And according to best governance practices, the manager has four possible paths for each risk:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Mitigate<\/strong> create preventative barriers to reduce the chance of the problem occurring;<\/li>\n\n\n\n<li><strong>Transfer:<\/strong> pass on the financial impact to a third party, such as an insurer or third-party partner;<\/li>\n\n\n\n<li><strong>Avoid<\/strong> change the scope or technology of the project to eliminate the risk entirely;<\/li>\n\n\n\n<li><strong>Accept<\/strong> passively monitor the risk, should the cost of repairing it be greater than the impact of the damage itself.<\/li>\n<\/ul>\n\n\n\n<p><strong>Also read:<\/strong> <a href=\"https:\/\/actiosoftware.com\/en\/blog\/how-to-do-project-management-planning\/\" target=\"_blank\" rel=\"noreferrer noopener\">Project management planning<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Practical implementation of responses<\/h3>\n\n\n\n<p>Having great contingency plans saved on the server does not protect any company's cash. Therefore, the fourth step consists of putting the designed strategies into practice in the daily operations.<\/p>\n\n\n\n<p>This involves allocating specific reserve budgets, adjusting the official schedule, and most importantly, defining <strong>bonds for each risk<\/strong>.&nbsp;<\/p>\n\n\n\n<p>Each action plan needs to have a direct responsible person mapped. This person will be responsible for monitoring \"smoke signals\" and activating emergency protocols as soon as the risk trigger is pulled.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Monitoring, control, and continuous improvement<\/h3>\n\n\n\n<p>The market changes rapidly, new technologies emerge, and team behavior fluctuates. Therefore, a <a href=\"https:\/\/actiosoftware.com\/en\/blog\/the-power-of-chatgpt-in-risk-matrix-classification\/\" target=\"_blank\" rel=\"noreferrer noopener\">risk matrix<\/a> It is never fully complete. And continuous monitoring ensures that the safeguards established in the previous stage continue to function as intended.<\/p>\n\n\n\n<p>Additionally, the manager must institute periodic review rituals. In these meetings, the team assesses whether old risks have weakened, if new threats have appeared on the radar, and if response plans need to be recalibrated. It is this discipline that transforms risk management into a living pillar of corporate intelligence.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-estrategias-e-implementacao-para-a-mitigacao-de-riscos\">Strategies and implementation for risk mitigation<\/h4>\n\n\n\n<p>As we have seen, putting defenses into practice requires proactive decisions and adaptability. Therefore, to successfully mitigate risks, managers typically use four classic market strategies:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Avoid risk<\/strong> alter the project plan or scope to eliminate the threat completely;<\/li>\n\n\n\n<li><strong>Transfer the risk<\/strong> transfer the financial impact to a third party, such as through purchasing insurance or outsourcing steps;<\/li>\n\n\n\n<li><strong>Accept the risk<\/strong> recognize the existence of the threat and allocate budget or time to cover the consequences, should it occur;<\/li>\n\n\n\n<li><strong>Reduce risk<\/strong> take immediate action to reduce the chance of the problem occurring or lessen its impact on operations.<\/li>\n<\/ul>\n\n\n\n<p>However, remember that the correct execution of these actions depends on continuous monitoring. Leaders need to have the autonomy to act quickly as soon as the system triggers a non-compliance alert.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-conheca-o-belt-o-software-de-gestao-de-riscos-da-actio\">Meet Belt, the risk management software from Actio<\/h2>\n\n\n\n<p>Project risk management is an essential practice that can make the difference between a project's success and failure. After all, by identifying, analyzing, and planning responses to risks, project teams can increase their chances of meeting deadlines. Furthermore, it is also possible to stay within budget and deliver high-quality results.&nbsp;<\/p>\n\n\n\n<p>And managing all these steps manually in spreadsheets exposes the project to human errors and missed deadlines. Therefore, Actio, a company in the <a href=\"https:\/\/falconi.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Falconi Group<\/a>, developed the <a href=\"https:\/\/actiosoftware.com\/en\/risk-management\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Belt<\/strong><\/a>Software that was specifically programmed to meet your organization's governance needs.<\/p>\n\n\n\n<p>Thus, with centralized communication, the <strong>Belt<\/strong> It is the ideal tool to create your risk matrix, design mitigation plans, and track the actions of those responsible in real-time.<\/p>\n\n\n\n<p>Want to protect your business deliveries and make data-driven decisions? <strong>Count on Actio and follow our social media for more management tips: <\/strong><a href=\"https:\/\/www.instagram.com\/actionorthamerica\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a>, <a href=\"https:\/\/www.linkedin.com\/company\/actiobrasil?originalSubdomain=br\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> and <a href=\"https:\/\/www.facebook.com\/actionorthamerica\/\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a>!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-perguntas-frequentes-sobre-gerenciamento-de-riscos-em-projetos\"><strong><strong>Frequently Asked Questions about Project Risk Management<\/strong><\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/atraente-jovem-empresario-europeu-com-laptop-em-pe-sobre-fundo-de-concreto-com-pontos-de-interrogacao-e-esboco-de-rabisco-confusao-e-conceito-de-resposta.jpg\" alt=\"Frequently asked questions about project risk management\" class=\"wp-image-38197\" srcset=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/atraente-jovem-empresario-europeu-com-laptop-em-pe-sobre-fundo-de-concreto-com-pontos-de-interrogacao-e-esboco-de-rabisco-confusao-e-conceito-de-resposta.jpg 1000w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/atraente-jovem-empresario-europeu-com-laptop-em-pe-sobre-fundo-de-concreto-com-pontos-de-interrogacao-e-esboco-de-rabisco-confusao-e-conceito-de-resposta-300x200.jpg 300w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/atraente-jovem-empresario-europeu-com-laptop-em-pe-sobre-fundo-de-concreto-com-pontos-de-interrogacao-e-esboco-de-rabisco-confusao-e-conceito-de-resposta-768x512.jpg 768w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/atraente-jovem-empresario-europeu-com-laptop-em-pe-sobre-fundo-de-concreto-com-pontos-de-interrogacao-e-esboco-de-rabisco-confusao-e-conceito-de-resposta-600x400.jpg 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p>Check out some of the most common questions on the topic below:<\/p>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1780443976684\"><strong class=\"schema-faq-question\"><strong>What is the validity of a risk management program?\u00a0<\/strong><\/strong> <p class=\"schema-faq-answer\">The validity of a risk management program can vary, but it is recommended to review and update it periodically to ensure it remains effective and relevant.\u00a0<br><br>The frequency of this review depends on changes in the organization\u2019s circumstances and business environment.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780443999085\"><strong class=\"schema-faq-question\"><strong>Can all risks be completely eliminated?<\/strong><\/strong> <p class=\"schema-faq-answer\">No. Zero risk does not exist in any project. Although some threats can be avoided by changing the scope, most risks can only be mitigated (reduced) or transferred.\u00a0<br><br>The goal of management, therefore, is to keep threats under control so that they do not impact the business's cash flow or deadlines.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1780444025886\"><strong class=\"schema-faq-question\"><strong>What are the biggest challenges in risk management?\u00a0<\/strong><\/strong> <p class=\"schema-faq-answer\">The main challenges are the lack of historical data to predict failures and the team's cultural resistance, as they often view mapping as bureaucracy. Additionally, the lack of adequate tools causes risks to be forgotten in static spreadsheets, losing their <em>timing<\/em> action.<\/p> <\/div> <\/div>","protected":false},"excerpt":{"rendered":"<p>Discover the importance of risk management in projects and its crucial steps. Learn more for business success!<\/p>","protected":false},"author":20,"featured_media":38199,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1203],"tags":[],"Idioma-posts":[1169,1168,1167],"class_list":["post-38181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-riscos-e-compliance","idioma-posts-espanhol","idioma-posts-ingles","idioma-posts-portugues"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gerenciamento de riscos em projetos: o que \u00e9 e como fazer?<\/title>\n<meta name=\"description\" content=\"Venha com a Actio e descubra a import\u00e2ncia do gerenciamento de riscos em projetos e suas etapas cruciais para o sucesso empresarial!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/actiosoftware.com\/en\/blog\/everything-about-risk-management-in-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gerenciamento de riscos em projetos: guia completo Actio\" \/>\n<meta property=\"og:description\" content=\"Venha com a Actio e descubra a import\u00e2ncia do gerenciamento de riscos em projetos e suas etapas cruciais para o sucesso empresarial!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/actiosoftware.com\/en\/blog\/everything-about-risk-management-in-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Actio\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/actiobrasil\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-27T13:30:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-02T23:48:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"665\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Heloise Pontes\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Heloise Pontes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/\"},\"author\":{\"name\":\"Heloise Pontes\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/651267a28d519a2d6599ae4cc4c6f5b0\"},\"headline\":\"Gerenciamento de riscos em projetos: guia completo Actio\",\"datePublished\":\"2025-10-27T13:30:00+00:00\",\"dateModified\":\"2026-06-02T23:48:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/\"},\"wordCount\":1658,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg\",\"articleSection\":[\"Riscos e Compliance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/\",\"name\":\"Gerenciamento de riscos em projetos: o que \u00e9 e como fazer?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg\",\"datePublished\":\"2025-10-27T13:30:00+00:00\",\"dateModified\":\"2026-06-02T23:48:05+00:00\",\"description\":\"Venha com a Actio e descubra a import\u00e2ncia do gerenciamento de riscos em projetos e suas etapas cruciais para o sucesso empresarial!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443976684\"},{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443999085\"},{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780444025886\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg\",\"width\":1000,\"height\":665,\"caption\":\"tudo sobre o gerenciamento de riscos em projetos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/actiosoftware.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gerenciamento de riscos em projetos: guia completo Actio\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"name\":\"Actio\",\"description\":\"Softwares para gest\u00e3o estrat\u00e9gica\",\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/actiosoftware.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\",\"name\":\"Actio\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"width\":150,\"height\":37,\"caption\":\"Actio\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/actiobrasil\",\"https:\\\/\\\/www.instagram.com\\\/actiobrasil\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/actiosoftware\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/651267a28d519a2d6599ae4cc4c6f5b0\",\"name\":\"Heloise Pontes\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g\",\"caption\":\"Heloise Pontes\"},\"description\":\"Product Manager da Actio Software e respons\u00e1vel por conduzir o ciclo de vida dos produtos.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/heloise-pontes\\\/\"],\"url\":\"https:\\\/\\\/actiosoftware.com\\\/en\\\/blog\\\/author\\\/heloise-pontes\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443976684\",\"position\":1,\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443976684\",\"name\":\"Qual \u00e9 a validade de um programa de gerenciamento de riscos?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A validade de um programa de gerenciamento de riscos pode variar, mas \u00e9 recomend\u00e1vel que seja revisado e atualizado periodicamente para garantir que permane\u00e7a eficaz e relevante.\u00a0<br><br>Al\u00e9m disso, a frequ\u00eancia dessa revis\u00e3o depende das mudan\u00e7as nas circunst\u00e2ncias e no ambiente de neg\u00f3cios da organiza\u00e7\u00e3o.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443999085\",\"position\":2,\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780443999085\",\"name\":\"Todos os riscos podem ser completamente eliminados?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"N\u00e3o. O risco zero n\u00e3o existe em nenhum projeto. Embora algumas amea\u00e7as possam ser evitadas mudando o escopo, a maioria dos riscos s\u00f3 pode ser mitigada (reduzida) ou transferida.\u00a0<br><br>O objetivo da gest\u00e3o, portanto, \u00e9 manter as amea\u00e7as sob controle para que elas n\u00e3o impactem o caixa ou os prazos do neg\u00f3cio.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780444025886\",\"position\":3,\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\\\/#faq-question-1780444025886\",\"name\":\"Quais s\u00e3o os maiores desafios na gest\u00e3o de riscos?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Os principais desafios s\u00e3o a falta de dados hist\u00f3ricos para prever falhas e a resist\u00eancia cultural da equipe, que muitas vezes enxerga o mapeamento como burocracia. Al\u00e9m disso, a falta de ferramentas adequadas faz com que os riscos fiquem esquecidos em planilhas est\u00e1ticas, perdendo o <em>timing<\\\/em> de a\u00e7\u00e3o.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Risk management in projects: what it is and how to do it?","description":"Come with Actio and discover the importance of risk management in projects and its crucial steps for business success!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/actiosoftware.com\/en\/blog\/everything-about-risk-management-in-projects\/","og_locale":"en_US","og_type":"article","og_title":"Gerenciamento de riscos em projetos: guia completo Actio","og_description":"Venha com a Actio e descubra a import\u00e2ncia do gerenciamento de riscos em projetos e suas etapas cruciais para o sucesso empresarial!","og_url":"https:\/\/actiosoftware.com\/en\/blog\/everything-about-risk-management-in-projects\/","og_site_name":"Actio","article_publisher":"https:\/\/www.facebook.com\/actiobrasil","article_published_time":"2025-10-27T13:30:00+00:00","article_modified_time":"2026-06-02T23:48:05+00:00","og_image":[{"width":1000,"height":665,"url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg","type":"image\/jpeg"}],"author":"Heloise Pontes","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Heloise Pontes","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#article","isPartOf":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/"},"author":{"name":"Heloise Pontes","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/651267a28d519a2d6599ae4cc4c6f5b0"},"headline":"Gerenciamento de riscos em projetos: guia completo Actio","datePublished":"2025-10-27T13:30:00+00:00","dateModified":"2026-06-02T23:48:05+00:00","mainEntityOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/"},"wordCount":1658,"commentCount":0,"publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg","articleSection":["Riscos e Compliance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/","url":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/","name":"Risk management in projects: what it is and how to do it?","isPartOf":{"@id":"https:\/\/actiosoftware.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#primaryimage"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg","datePublished":"2025-10-27T13:30:00+00:00","dateModified":"2026-06-02T23:48:05+00:00","description":"Come with Actio and discover the importance of risk management in projects and its crucial steps for business success!","breadcrumb":{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443976684"},{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443999085"},{"@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780444025886"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#primaryimage","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2023\/10\/mulheres-trabalhando-juntas-no-alto-angulo-do-escritorio.jpg","width":1000,"height":665,"caption":"tudo sobre o gerenciamento de riscos em projetos"},{"@type":"BreadcrumbList","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/actiosoftware.com\/"},{"@type":"ListItem","position":2,"name":"Gerenciamento de riscos em projetos: guia completo Actio"}]},{"@type":"WebSite","@id":"https:\/\/actiosoftware.com\/#website","url":"https:\/\/actiosoftware.com\/","name":"Actio","description":"Softwares para gest\u00e3o estrat\u00e9gica","publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/actiosoftware.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/actiosoftware.com\/#organization","name":"Actio","url":"https:\/\/actiosoftware.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","width":150,"height":37,"caption":"Actio"},"image":{"@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/actiobrasil","https:\/\/www.instagram.com\/actiobrasil\/","https:\/\/www.linkedin.com\/company\/actiosoftware\/"]},{"@type":"Person","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/651267a28d519a2d6599ae4cc4c6f5b0","name":"Heloise Pontes","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8a442dab2b7b38df0f240edb9afe33f93aa79552c397387f92510b56f0ec1a87?s=96&d=mm&r=g","caption":"Heloise Pontes"},"description":"Product Manager at Actio Software, responsible for driving the product lifecycle.","sameAs":["https:\/\/www.linkedin.com\/in\/heloise-pontes\/"],"url":"https:\/\/actiosoftware.com\/en\/blog\/author\/heloise-pontes\/"},{"@type":"Question","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443976684","position":1,"url":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443976684","name":"What is the validity of a risk management program?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"A validade de um programa de gerenciamento de riscos pode variar, mas \u00e9 recomend\u00e1vel que seja revisado e atualizado periodicamente para garantir que permane\u00e7a eficaz e relevante.\u00a0<br><br>Al\u00e9m disso, a frequ\u00eancia dessa revis\u00e3o depende das mudan\u00e7as nas circunst\u00e2ncias e no ambiente de neg\u00f3cios da organiza\u00e7\u00e3o.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443999085","position":2,"url":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780443999085","name":"Can all risks be completely eliminated?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"N\u00e3o. O risco zero n\u00e3o existe em nenhum projeto. Embora algumas amea\u00e7as possam ser evitadas mudando o escopo, a maioria dos riscos s\u00f3 pode ser mitigada (reduzida) ou transferida.\u00a0<br><br>O objetivo da gest\u00e3o, portanto, \u00e9 manter as amea\u00e7as sob controle para que elas n\u00e3o impactem o caixa ou os prazos do neg\u00f3cio.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780444025886","position":3,"url":"https:\/\/actiosoftware.com\/blog\/tudo-sobre-o-gerenciamento-de-riscos-em-projetos\/#faq-question-1780444025886","name":"What are the biggest challenges in risk management?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Os principais desafios s\u00e3o a falta de dados hist\u00f3ricos para prever falhas e a resist\u00eancia cultural da equipe, que muitas vezes enxerga o mapeamento como burocracia. Al\u00e9m disso, a falta de ferramentas adequadas faz com que os riscos fiquem esquecidos em planilhas est\u00e1ticas, perdendo o <em>timing<\/em> de a\u00e7\u00e3o.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/38181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/comments?post=38181"}],"version-history":[{"count":2,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/38181\/revisions"}],"predecessor-version":[{"id":71457,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/38181\/revisions\/71457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media\/38199"}],"wp:attachment":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media?parent=38181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/categories?post=38181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/tags?post=38181"},{"taxonomy":"idioma-posts","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/Idioma-posts?post=38181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}