{"id":17676,"date":"2024-07-26T09:30:00","date_gmt":"2024-07-26T12:30:00","guid":{"rendered":"http:\/\/novosite.stratec.com.br\/4-dicas-para-definir-escopo-projetos\/"},"modified":"2026-04-21T21:07:02","modified_gmt":"2026-04-22T00:07:02","slug":"4-tips-for-defining-project-scope","status":"publish","type":"post","link":"https:\/\/actiosoftware.com\/en\/blog\/4-dicas-para-definir-escopo-projetos\/","title":{"rendered":"Scope Definition: 4 Tips to Avoid Rework"},"content":{"rendered":"<p>In project management, everything starts with a phase that is often underestimated: defining the scope. This is when you establish exactly what will be delivered, what resources will be used, and what limits the project has. In other words, the scope defines what is in and what is out of the project.<\/p>\n\n\n\n<p>Despite seeming simple, this is one of the main causes of project failures. When the scope is not well-defined or aligned with the company's strategic objectives, problems arise such as increased costs, delays, and rework.<\/p>\n\n\n\n<p>To give you an idea, a large part of projects fail precisely due to a lack of clarity in this initial stage. Next, you will understand how to correctly define project scope with practical and applicable tips for everyday use.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-o-que-e-escopo-de-projeto-na-pratica\">What is project scope in practice<\/h3>\n\n\n\n<p>Actio\u2019s <a href=\"https:\/\/actiosoftware.com\/en\/blog\/project-scope-what-is-and-how-to-apply\/\" target=\"_blank\" rel=\"noreferrer noopener\">project scope <\/a>It is the detailed description of everything that will be delivered at the end of an initiative. It includes deliverables, functionalities, activities, necessary resources, and project limitations. A good scope eliminates doubts and reduces the risk of unexpected changes along the way.<\/p>\n\n\n\n<p>For example, when developing a system, the scope should clearly state which functionalities are part of the delivery, such as user registration, reports, or integration with other systems, and also what will not be included.<\/p>\n\n\n\n<p>This clarity is essential for aligning expectations among all stakeholders.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why is it so important to define the scope well<\/h2>\n\n\n\n<p>When the scope is not well-defined, the project becomes vulnerable to constant changes, misalignment between teams, and increased costs.<\/p>\n\n\n\n<p>Furthermore, deadlines can be compromised because new demands arise without proper planning.<\/p>\n\n\n\n<p>On the other hand, a well-structured scope brings predictability, improves communication among stakeholders, and increases the chances of project success.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4 tips for correctly defining the scope of projects<\/h2>\n\n\n\n<p>Correctly defining the project scope is one of the most important factors for ensuring the initiative's success. This step requires attention, analysis, and alignment among all stakeholders. Here's how to do it more <a href=\"https:\/\/actiosoftware.com\/en\/blog\/efficiency-and-effectiveness-optimize-resources-and-business-results\/\" target=\"_blank\" rel=\"noreferrer noopener\">efficient<\/a>:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Collect and document all requirements<\/h3>\n\n\n\n<p>The first step in defining the scope is to understand exactly what the project's objective is.<\/p>\n\n\n\n<p>This involves collecting requirements with all stakeholders, meaning everyone impacted directly or indirectly by the project.<\/p>\n\n\n\n<p>In practice, this means talking to clients, managers, technical teams, and end-users to understand their needs.<\/p>\n\n\n\n<p>For example, in a software project, it's necessary to identify which modules will be developed, such as financial control, reports, or people management, and what functionalities each module should have.<\/p>\n\n\n\n<p>An efficient way to organize this information is by using a requirements traceability matrix. This tool allows you to document each requirement and justify its importance, showing how it contributes to the project's final objective.<\/p>\n\n\n\n<p>This avoids the inclusion of unnecessary demands and helps maintain focus.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Identify premises and constraints<\/h3>\n\n\n\n<p>Another essential and often overlooked point is defining assumptions and constraints.<\/p>\n\n\n\n<p>The premises are conditions considered true for the project to happen. For example, assuming that certain resources will be available or that suppliers will deliver materials on time.<\/p>\n\n\n\n<p>The restrictions are limitations that impact the project, such as budget, deadline, or team availability.<\/p>\n\n\n\n<p>A simple example: if a project has a limited budget, this directly influences technology choices, delivery scope, and the possible quality level.<\/p>\n\n\n\n<p>Ignoring these factors can lead to unrealistic expectations and compromise the final outcome.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Structure the WBS (Work Breakdown Structure)<\/h3>\n\n\n\n<p>EAP is one of the most important tools in defining scope.<\/p>\n\n\n\n<p>It consists of dividing the project into smaller parts, making it easier to visualize all the necessary deliverables and activities.<\/p>\n\n\n\n<p>Instead of working with a generic vision, you will have a clear breakdown of everything that needs to be done.<\/p>\n\n\n\n<p>For example, in a construction project, the final delivery can be divided into stages such as foundation, structure, electrical systems, and finishing. Each of these stages can be further detailed, depending on the complexity.<\/p>\n\n\n\n<p>This structure helps to scale resources, estimate timelines, and identify potential bottlenecks.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Validate the scope with the stakeholders<\/h3>\n\n\n\n<p>After structuring the scope, it is essential to validate it with all stakeholders.<\/p>\n\n\n\n<p>This validation ensures everyone is aligned on what will be delivered and avoids conflicts throughout the project.<\/p>\n\n\n\n<p>Without this step, it's common for questions to arise such as \u201cthat wasn't agreed upon\u201d or \u201cthat should have been included.\u201d.<\/p>\n\n\n\n<p>When the scope is formally approved, it becomes a reference document. This brings more security to the team and facilitates change management.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How does technology help define scope<\/h2>\n\n\n\n<p>Manually managing scope can be a challenge, especially in more complex projects. The lack of centralized information and difficulty in tracking can compromise execution.<\/p>\n\n\n\n<p>With the use of project management software, it's possible to organize requirements, structure the WBS, track deliverables, and keep all stakeholders aligned in real-time.<\/p>\n\n\n\n<p>Additionally, technology allows for recording changes, tracking project history, and ensuring more control over deadlines and costs. Planning and defining the scope of a project doesn't have to be difficult or contentious. Follow these tips, use a project management tool to\u00a0<a href=\"https:\/\/actiosoftware.com\/en\/blog\/effective-communication-project-management\/\" target=\"_blank\" rel=\"noopener noreferrer\">accelerate information flows<\/a> and optimize your work!<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"150\" src=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2018\/11\/bot-solicite-pt.png\" alt=\"Strategic management software\" class=\"wp-image-18587\" srcset=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2018\/11\/bot-solicite-pt.png 600w, https:\/\/actiosoftware.com\/wp-content\/uploads\/2018\/11\/bot-solicite-pt-300x75.png 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>In project management, scope definition is the first item to be carried out. Click here and see how.<\/p>","protected":false},"author":10,"featured_media":52796,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1246],"tags":[],"Idioma-posts":[1169,1167],"class_list":["post-17676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-estrategia-e-performance","idioma-posts-espanhol","idioma-posts-portugues"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Defini\u00e7\u00e3o de escopo: o ponto de partida para o sucesso do projeto<\/title>\n<meta name=\"description\" content=\"Aprenda como definir o escopo de projetos de forma eficiente, evitar atrasos e controlar custos com dicas pr\u00e1ticas e exemplos aplic\u00e1veis.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/actiosoftware.com\/en\/blog\/4-tips-for-defining-project-scope\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho\" \/>\n<meta property=\"og:description\" content=\"Aprenda como definir o escopo de projetos de forma eficiente, evitar atrasos e controlar custos com dicas pr\u00e1ticas e exemplos aplic\u00e1veis.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/actiosoftware.com\/en\/blog\/4-tips-for-defining-project-scope\/\" \/>\n<meta property=\"og:site_name\" content=\"Actio\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/actiobrasil\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-26T12:30:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T00:07:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guilherme Barbassa\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guilherme Barbassa\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/\"},\"author\":{\"name\":\"Guilherme Barbassa\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/cf23461d8ee5c5a8df7a56866d4ecf65\"},\"headline\":\"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho\",\"datePublished\":\"2024-07-26T12:30:00+00:00\",\"dateModified\":\"2026-04-22T00:07:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/\"},\"wordCount\":955,\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2017\\\/07\\\/2149749859.jpg\",\"articleSection\":[\"Estrat\u00e9gia e Performance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/\",\"name\":\"Defini\u00e7\u00e3o de escopo: o ponto de partida para o sucesso do projeto\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2017\\\/07\\\/2149749859.jpg\",\"datePublished\":\"2024-07-26T12:30:00+00:00\",\"dateModified\":\"2026-04-22T00:07:02+00:00\",\"description\":\"Aprenda como definir o escopo de projetos de forma eficiente, evitar atrasos e controlar custos com dicas pr\u00e1ticas e exemplos aplic\u00e1veis.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2017\\\/07\\\/2149749859.jpg\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2017\\\/07\\\/2149749859.jpg\",\"width\":1000,\"height\":667},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/blog\\\/4-dicas-para-definir-escopo-projetos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/actiosoftware.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#website\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"name\":\"Actio\",\"description\":\"Softwares para gest\u00e3o estrat\u00e9gica\",\"publisher\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/actiosoftware.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#organization\",\"name\":\"Actio\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"contentUrl\":\"https:\\\/\\\/actiosoftware.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/logo-150x37-3.png\",\"width\":150,\"height\":37,\"caption\":\"Actio\"},\"image\":{\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/actiobrasil\",\"https:\\\/\\\/www.instagram.com\\\/actiobrasil\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/actiosoftware\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/actiosoftware.com\\\/#\\\/schema\\\/person\\\/cf23461d8ee5c5a8df7a56866d4ecf65\",\"name\":\"Guilherme Barbassa\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g\",\"caption\":\"Guilherme Barbassa\"},\"description\":\"Guilherme Barbassa \u00e9 CEO da Actio Software, com mais de 20 anos de experi\u00eancia em gest\u00e3o estrat\u00e9gica e transforma\u00e7\u00e3o empresarial. Atua na integra\u00e7\u00e3o entre estrat\u00e9gia, governan\u00e7a e tecnologia, apoiando a alta lideran\u00e7a na constru\u00e7\u00e3o de sistemas de gest\u00e3o orientados a resultados.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/guilherme-barbassa-247b8932\\\/\"],\"url\":\"https:\\\/\\\/actiosoftware.com\\\/en\\\/blog\\\/author\\\/guiceo\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Definition of scope: the starting point for project success","description":"Learn how to define project scope efficiently, avoid delays, and control costs with practical tips and applicable examples.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/actiosoftware.com\/en\/blog\/4-tips-for-defining-project-scope\/","og_locale":"en_US","og_type":"article","og_title":"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho","og_description":"Aprenda como definir o escopo de projetos de forma eficiente, evitar atrasos e controlar custos com dicas pr\u00e1ticas e exemplos aplic\u00e1veis.","og_url":"https:\/\/actiosoftware.com\/en\/blog\/4-tips-for-defining-project-scope\/","og_site_name":"Actio","article_publisher":"https:\/\/www.facebook.com\/actiobrasil","article_published_time":"2024-07-26T12:30:00+00:00","article_modified_time":"2026-04-22T00:07:02+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg","type":"image\/jpeg"}],"author":"Guilherme Barbassa","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guilherme Barbassa","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#article","isPartOf":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/"},"author":{"name":"Guilherme Barbassa","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/cf23461d8ee5c5a8df7a56866d4ecf65"},"headline":"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho","datePublished":"2024-07-26T12:30:00+00:00","dateModified":"2026-04-22T00:07:02+00:00","mainEntityOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/"},"wordCount":955,"publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg","articleSection":["Estrat\u00e9gia e Performance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/","url":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/","name":"Definition of scope: the starting point for project success","isPartOf":{"@id":"https:\/\/actiosoftware.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#primaryimage"},"image":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg","datePublished":"2024-07-26T12:30:00+00:00","dateModified":"2026-04-22T00:07:02+00:00","description":"Learn how to define project scope efficiently, avoid delays, and control costs with practical tips and applicable examples.","breadcrumb":{"@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#primaryimage","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2017\/07\/2149749859.jpg","width":1000,"height":667},{"@type":"BreadcrumbList","@id":"https:\/\/actiosoftware.com\/blog\/4-dicas-para-definir-escopo-projetos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/actiosoftware.com\/"},{"@type":"ListItem","position":2,"name":"Defini\u00e7\u00e3o de escopo: 4 dicas para evitar retrabalho"}]},{"@type":"WebSite","@id":"https:\/\/actiosoftware.com\/#website","url":"https:\/\/actiosoftware.com\/","name":"Actio","description":"Softwares para gest\u00e3o estrat\u00e9gica","publisher":{"@id":"https:\/\/actiosoftware.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/actiosoftware.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/actiosoftware.com\/#organization","name":"Actio","url":"https:\/\/actiosoftware.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/","url":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","contentUrl":"https:\/\/actiosoftware.com\/wp-content\/uploads\/2020\/02\/logo-150x37-3.png","width":150,"height":37,"caption":"Actio"},"image":{"@id":"https:\/\/actiosoftware.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/actiobrasil","https:\/\/www.instagram.com\/actiobrasil\/","https:\/\/www.linkedin.com\/company\/actiosoftware\/"]},{"@type":"Person","@id":"https:\/\/actiosoftware.com\/#\/schema\/person\/cf23461d8ee5c5a8df7a56866d4ecf65","name":"Guilherme Barbassa","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c8a028cc83375c38ab9e78ddd4576e09a165b689ef24a52f1b6c7c474034ae50?s=96&d=mm&r=g","caption":"Guilherme Barbassa"},"description":"Guilherme Barbassa is CEO of Actio Software, with over 20 years of experience in strategic management and business transformation. He works in the integration between strategy, governance, and technology, supporting senior leadership in building results-oriented management systems.","sameAs":["https:\/\/www.linkedin.com\/in\/guilherme-barbassa-247b8932\/"],"url":"https:\/\/actiosoftware.com\/en\/blog\/author\/guiceo\/"}]}},"_links":{"self":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/17676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/comments?post=17676"}],"version-history":[{"count":2,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/17676\/revisions"}],"predecessor-version":[{"id":68736,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/posts\/17676\/revisions\/68736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media\/52796"}],"wp:attachment":[{"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/media?parent=17676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/categories?post=17676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/tags?post=17676"},{"taxonomy":"idioma-posts","embeddable":true,"href":"https:\/\/actiosoftware.com\/en\/wp-json\/wp\/v2\/Idioma-posts?post=17676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}